Skip to content
ABOUT STREBEL
COVID-19
SELECTION TOOL
CPD
BIM STORE
CAD
CONTACT US
01276685422
Search for:
PRODUCTS
CONDENSING WALL HUNG RANGE
S-CB+
S-CB+ Boiler Cascade Rigs
S-CBX
S-CBX Boiler Cascade Rigs
CONDENSING FLOOR STANDING RANGE
S-FX
S-CB FS
S-AF
HEAT PUMPS
S-ASX
S-ASX-R
WATER HEATERS
S-WG+
ATI-SPX
SDC-SLIMLINE
WATER STORAGE
S-DW-I
S-HW-S
ATI-CC
CAST IRON
CA7 and BCA7
RU
OTHER
TURBOTEC GASIFYING LOG BOILERS
LOW LOSS HEADERS
PLATE HEAT EXCHANGERS
BOILER GUARD
HOW TO BUY
CONTACT ASM
TECHNICAL LIBRARY
LITERATURE
MANUALS
CAD DRAWINGS
BIM
DISCONTINUED PRODUCTS
S-HQ
RU3s OS Instructions
ATI-SP O&M Manual
CUSTOMER SERVICE
SERVICING, MAINTENANCE & SPARES
COMMISSIONING
WARRANTY
WATER TREATMENT GUIDELINES
CONTINUOUS PROFESSIONAL DEVELOPMENT
HEATING SYSTEM SELECTION TOOL
NEWS
CONTACT US
Heating System Selection Tool
Heating System Selection Tool
admin
2020-08-06T10:40:48+00:00
This form asks the relevant questions so that we can help with your commercial heating selection. There are a number of simple questions to give us an understanding of the site requirements so we can assist you on selecting the right equipment for the project. Nearly all the questions are tick boxes which we can respond by giving you information on the plantroom requirements.
* Required
Email Address
*
Site Name/Location
*
Type of project tick all that are appropriate
*
New Project
Replacement
Listed?
Other
Please describe your project
*
Type of building
*
Office
School
House
Flats
Energy Centre
Hospital/Clinic
Hotel
Sports Centre
Launderette
Other
Please describe your building
*
Site Constraints and potential issues, tick all that are relevant
*
Plantroom Space, limited space for the boilers?
Plantroom Access, can you get plant in and out of the plantroom?
Plantroom Height; can be an issue if under 2.5-2.8m
Basement plantroom; check flue and ventilation access
Asbestos present in plant or used for insulation, check asbestos register
Ventilation issues i.e. size or position does not comply to current regulation
Drainage in plantroom, this is for condensing boilers
Poor Lighting
Other
Please describe your potential constraints or issues
*
Notes on any potential Site issues or requirements
What is the heating system supplying? tick all that is appropriate
*
Constant temperature circuit(s)
Variable temperature circuit(s)
Hot Water
Air handling Units
Radiators
Swimming pool
Underfloor Heating
Heat Interface Units (HIU)
Other
Please describe what heating the heating system is supplying
*
Type of system and equipment required for heating, tick all that are relevant for this project
*
Air Source Heat Pumps (ASHP)
Ultra Low NOx Condensing
Low NOx Condensing
Mixed System
Pressurised system
Vented System
Split primary unvented and secondary unvented
Split primary unvented and secondary vented
Hydraulically separated with Low Loss Header (LLH)
Hydraulically separated with a Boiler Guard, (air & dirt separator and magnetic filter)
Hydraulically separated with plate heat exchanger (brazed)
Hydraulically separated with plate heat exchanger (gasketed)
High Temperature differential system required (for low return temperature)
"No flow" Boilers required
Dosing Pot
Boiler Safety valves
Floor mounted boilers: individual primary pumps
Other
Please describe your type of system
*
Capacity of heating System required in kW
*
Please enter a numerical value without the unit (kW)
System Operating Pressure at working temperature in Bar
*
Please enter a numerical value without the unit (bar)
System Maximum operating temperature in Centigrade (°C)
Please enter a numerical value without the unit (°C)
System Minimum operating temperature in Centigrade (°C)
Please enter a numerical value without the unit (°C)
Controls required
*
BMS on site
New control panel required
Existing control panel to be retained and adapted
Use on-board boiler controls
Local Boiler control required
Other
Please describe your controls required
*
Hot Water
*
Hot water system required
Hot water not required
Do you require hot water?
Quantity of hot water required
*
Please enter a numerical value
Hot Water Supplying
*
Kitchen
Commercial Kitchen
Toilets
Bathrooms/Showers
Laundrette
Process
Other
Please describe where your hot water needs supplying
*
Equipment required
Indirect glass lined calorifier
Indirect stainless Steel calorifier
Direct fired condensing, modulating low NOx Waterheater (533 to 3420l/h per heater)
Direct fired low NOx Waterheater (210 to 370l/h per heater, 1st hour max 888l/h)
Solar Thermal System
Additional expansion vessels
Other
Please describe what equipment is required
*
Flue and Ventilation
Ventilation natural high and low level
Ventilation natural high and fanned low level
Ventilation Fanned both high and low level
Open Flue B23 type
Room sealed
Asbestos flue or asbestos flue joints
Balanced flue Concentric
Balanced flue Twin Pipe
Fan dilution system
Fan assist system
Natural draught
Suitably Lined Chimney
Monodraught System
Existing flue suitable for the proposed new plant
Flue Terminal suitable for pluming
IGE UP10 low discharge check sheet required (for boiler plant up to 333kW input)
CCTV inspection of the chimney required
Other
Please describe your flue and ventilation
*
Horizontal Flue Run in meters
Please enter a numerical value without the unit (m)
Vertical Flue Run in meters
Please enter a numerical value without the unit (m)
Any other information?
Your Contact Details and Information
Name
*
Your Company/Home Address
*
Postcode
*
Contact Telephone Number
*
Would you like a copy of your responses?
*
Yes
No
GDPR
*
Yes, I agree with the
privacy policy
and
terms and conditions
.
Submit
Go to Top